Operating Mines

Find the tonnes the plan is missing

Integrated simulation for operating mines, from debottlenecking to expansion

Most areas look close to target. The chain still misses plan.

Operational complexity, costs and productivity, and capital are the industry’s top three risks for 2026, in EY’s annual ranking. In an operating mine they are usually one problem, showing up in different places along the chain. Downtime in one area starves or blocks the next, stockpiles run empty or full, and the constraint moves as the ore and the fleet change. The losses sit between the areas, where no single report shows them.

Production is the biggest value lever an operation can influence, and fixed costs are paid whether the tonnes arrive or not. MISIM builds a digital representation of the whole chain, from mine to port, calibrated to your own operating data. It shows where production is lost, what the operation can deliver against the plan, and which investments recover the most.

We work for the owner and bring an independent view. We sit alongside operations and technical services, and the model stays useful long after the first answer.

See why mines miss plan

1

Production baseline check

Where is production lost, and where does the constraint sit? We use 12 to 24 months of operating data to rebuild the gap between plan and actual, area by area, and grade the data behind it.

It is a desktop review, not a simulation. It shows where the calibrated model should focus. If an expansion is in study, it also tests the expansion target against what the chain has demonstrated.

  • Losses by area and by cause
  • Where the constraint sits, and how often it moves
  • The levers worth testing in the model
Illustrative chart: annual production against plan, with losses by area from mine to port and the largest loss highlighted

2

Calibrated chain model

A digital representation of the whole chain, built from your operating data, plans and the knowledge of the people who run it. It is calibrated until it reproduces what the operation has actually done, then run forward on the plan.

Watch: Why Mines Miss Plan

  • Mine, hoisting or haulage, plant, rail and port
  • Failures, repairs and maintenance from your own records
  • Stockpiles, bins and surge as they really behave
Illustrative chart: monthly production over two years, model against actual, with two shutdown months and the plan line

3

A plan you can deliver

Expected annual production and its range for the budget and life-of-mine plan, built on demonstrated performance rather than design rates. The model stays current, so each planning cycle starts from what the operation has actually done.

Read: Model custodianship

  • Expected production against the plan
  • The range, and what drives it
  • Inputs for the budget and financial model
Illustrative chart: annual production over 1,000 simulated years with P10, P50 and P90, against a budget set on design rates

4

Capital that pays

You can spend heavily on one area and still miss the result, if the constraint simply moves downstream. Test debottlenecking and expansion before capital is committed. That covers equipment upgrades, surge capacity and maintenance strategy, or a new mine, plant or shaft tested with the chain it plugs into.

Watch: Where should you invest to increase mine production?

  • Production added by each option
  • Which investments lift the chain, and which only move the constraint
  • Evidence for capital approval
Illustrative chart: investment combinations by delivered production and incremental capital, with the efficient front highlighted

Where should you invest to increase mine production?

Related case studies

Shell Albian Sands: Integrated Operating Model

read the case study

Sifto Canada: Mining Method Change at Goderich

read the case study

Planning a budget, debottleneck or expansion?

Tell us where production is falling short and what’s being decided. We’ll suggest the smallest piece of work that answers it.

contact us